Friday, December 9, 2011

Drywall pictures!


We'll start in the front of the house - the living room! The bay window is looking nice.
The fireplace area has been touched up. This also shows both arches, which has been difficult to capture. The arch on the left leads to the office/second bedroom; the arch on the right leads to the dining room.
Looking through the arch to the progress in the dining room. Kitchen and laundry beyond.
This guy is good. I probably shouldn't, but I was rubbing everything...it's all so smooth :)

The office/second bedroom is coming together. The bookshelf looks awesome!

I can't believe I thought about taking these out. What an idiot I can be..
The north wall of the kitchen after all our updates! Master bedroom door, fridge hole, and laundry room.
A picture of the big, tall ceilings in the master bedroom now. Looking very smooth and nearly finished. I'll tell ya', once I've got this running water thing figured out, I'm moving in!

Tuesday, December 6, 2011

I'm so happy, I'm sick.

My personal definition of sickness is not eating on Thanksgiving. It’s my holiday. One I still get legitimately excited about. And this year – like last year – I spent it curled up on the living room floor, sleeping the day away. Not that I’m complaining about sleeping all day…that was nice. The food thing still irks me a little though.
Anyway, I’m pretty sure I’ve got a version of the same thing everyone has lately. Cough, sore throat, running nose, achy, hot/cold, sweaty/clammy, tired, dehydrated, no appetite..Basically worthless. There for a while, I legitimately thought it was the Mesothelioma catching up with me from ripping out the old insulation. I stopped short of calling the Law Offices of So-and-So for my free consultation because my dad ripped out way more than I did and he seems Meso-symptom free.
So, I’ve been drinking plenty of water, eating lots of oranges (thank you FFA fundraiser!), and sleeping almost constantly. This includes while riding in cars with friends. In addition to my newfound narcolepsy, I seem to have also found a drywaller! My local guy came through! Disclaimer: he was a little slower getting started than he let on…but I also called him last minute after he had sworn off new jobs for the year and persuaded him to take me back.

The last two days have been mostly prep-work – fixing screw heads, putting the corner strips on (including the cool flexible ones for the arches), and getting set for the real deal. In our conversation last night, he thought he might be done a day before he initially planned, and that he would have the entire house taped by tonight! That fancy equipment makes things easy!
Pictures to follow – I’ll sneak in after he’s gone tonight and check progress. It’s coming together, gang!

Thursday, August 25, 2011

New (Old) Development!

So, remember how I wrote about not having “before” pictures in an earlier post? Well, that’s true. I didn’t…but the appraiser did. Stuffed into all of my loan information were a few pictures snapped by the woman who did a walk-through on the bank’s behalf. She also included a rough floor plan, which is helpful when you’re not familiar with the place but trying to piece my pictures together. I’ve included little signals so you can see exactly where the pictures were taken from so you can gain a little more insight.
From a design standpoint, the floor plan will stay almost exactly the same. We have moved a door here or there (not to mention added a garage), but the square footage of the living space remains.
1. Entry - new wiring, insulation, and drywall completed.
2. Living room - new electrical/audio wiring, insulation, and drywall completed.
3. Dining room - removed the partial chimney and corner hutch in addition to wiring, insulation, and drywall. 
4. Bedroom/Office - new wiring, insulation, and drywall in addition to the reconfigured closet layout and bookshelf addition.
5. Bathroom - removed paneling and massive amounts of unexplainable concrete, updated plumbing/electrical, and replaced the subfloor and wallboard. 
6. Bathroom - Pt. 2
7. Kitchen (facing Dining Room) - currently demo-ed. Planning for new cabinets and countertops.
8. Kitchen - Pt. 2
9. Laundry - a new door to the garage will take the place of the windows seen here.
10. Master Bedroom - moving the door and closet to improve the room's function. More to come!

Thursday, July 21, 2011

Detail: Front Half of the House

As promised, I’ll use this opportunity to give greater detail to the work progressing in the front half of the house: wiring, insulation, structural changes, and drywall.

Given the fact that we have since decided to remove much of the plaster and lathe in the house, the time we spent peeling wallpaper seems a bit wasted.. But, hindsight is 20-20. The original intent was to hang sheetrock over the wooden slats in the ceiling that the acoustical tiles had hung from. I went around with a screw gun and a ladder reinforcing the slats so they actually stay put once the drywall was fastened in place – after all, none of this is really any good if it falls in your mashed potatoes during dinner. Again, much of this has been for nothing because almost EVERYTHING came out anyway!
We started the gut job in the ‘front porch’ area of the house. When the house was built it was an open porch, a short time later it was screened in, and eventually enclosed with windows all around. The sellers referred to it – at that point – as the solarium.
They would sit there and drink tea with their grandparents and watch the activity on the street below. From that point, there have been windows taken out and changes to the roofline.
While I do plan to rebuild the latticework around the front door, I think it’s going to be too expensive to bring back the old windows and upper railing right now. Someday, though!

Anyway, in the entryway, we found the insulation and electrical work to be pretty spotty – both were replaced. I’m no electrician, but when your stereo turns on and off mysteriously, that’s an issue! Also, the large opening between the entry and the living room was sagging a bit, so we knew something would have to be done. What we didn’t know before the plaster came down was that it was severely under structured given the span it crossed and that it bore much of the weight of the gable above it.

With new headers and jack studs in place, we were squared up and ready for action!



The dining room was fairly straightforward. We’re adding three-way switches on either end so I can control the lights easier. Previously, there weren’t light switches in the front half of the house – only pull chains.


Partial chimney in the dining room.


Dining room facing the Kitchen/New Garage.
Dad and I removed the old partial chimney from the west wall of the dining room. This was originally the kitchen, and this chimney would have served the cooking aparatus at the time. I toyed with the idea of saving it, exposing and sealing the bricks, and building some cool bracket to support it. Once the plaster came down, we found large holes in two sides and failing mortar throughout. All for the best, though – this visually opens the space and leaves lots of room for hanging things on the wall.
There was a door between the dining room and the entryway – I assume – from the days when the entry was a porch and before the large opening existed between the entry and the living room. With the other openings present, it didn’t make sense from a traffic or visual standpoint to have this opening in place anymore. Studs + drywall = no more door!

The second bedroom/office room proved to be the biggest mental challenge of all the rooms thus far. Because we wanted to maintain the circular flow through the house, it was important that we find a way to accommodate that while also including storage options for the bedroom/office and adjacent bathroom while also providing privacy for those who might use it as a true bedroom someday.
Our solution – after much debating, head-scratching, and hand gesturing – was essentially to leave the space as is. We did make a few tweaks: we removed the cluster of tiny doors in the closet area and added another pocket door to the bedroom side of the bedroom/bathroom pass-through. We are also batting around the idea of hanging a larger barn-type door over the archway leading from the bedroom to the living room. This way, there will be privacy when needed and a wicked cool architectural feature when not in use.

My dad, the saint.



The reason we'll all probably have Mesothelioma.




Notice the partial chimney - as seen from the second bedroom/office. Also notice the Perfect 10 dismount off the ladder. 

As seen from INSIDE the bookshelf :)


Bedroom/Bathroom pass-through with bookshelf above.
Perhaps the coolest part – and by far the piece I’m most excited about – is the built-in bookcase over the closet. We’ve framed this in to accommodate books up to 15” tall, so it will be a nice space for stacks of books, artwork, and other fun stuff.
The COOLEST part of the coolest part: a library ladder that I'll have to track down and install later. (My friend Melanie asks excitedly, “Like in ‘Beauty and the Beast!?”  Not *exactly* my inspiration, but yes! J )
The living room is another room that will be left fairly untouched. Because of my concerns about keeping the bay window area and fireplace surround intact, we’ll be leaving the plaster in place. The west wall of the living room, however, is a fix that needs fixing. At one point there was another window on this wall and – like many places throughout the house – when they were done with the window it was covered up. In this case with wallboard of some kind. So, we’ll take that board down while we're at it.
The only other major update in the living room has been the wiring. Like everywhere else in the house, the wiring was a mix of new and old: knob and tube meets something else, spliced in with something else, blah blah blah. We’ve removed all of that and replaced it with modern, grounded wiring including wiring for a speaker system to be mounted around the room and TV above the fireplace. Nevermind that I don't OWN a TV that will fit on the fireplace..
With all of these changes taking place, it’s getting easier and easier to see the light at the end of the tunnel. While we’re still QUITE a way from completion, the new shape of the house is coming through and I feel great about knowing we’re leaving a positive, lasting impression on something that has meant so much to so many people.

That’s all for now – thanks again for stopping by!