Wednesday, October 5, 2011

Driveway, driveway, gettin' down on driveway

Silky smooth..
As you can see, my cement guy wasted no time in getting everything poured and smoothed out!
Per our conversations, he poured the cement so water would slope away from the garage door and stoop area. With the old concrete, some settling had taken place over the years and I noticed that water would pool up at the foot of the step on the days we had lots of rain. No more! Not only that, but – like I said in the previous post – we don’t have to walk around the mounds of gravel anymore. I’m so excited about this, it’s ridiculous.
Another new development: I’m installing windows?
When my siding guy came to check everything out, we talked about the best way to do everything. In that conversation he pointed out that the finished product would look better if the sheathing were smooth, or at least more consistent across the span of the wall from one addition to the next. While we had planned on that, he also pointed out that, I needed “new F$%#ing windows.”
He’s a pretty eloquent guy, but he’s also great at what he does J
I told him flat out that even though I would like to have new windows, it’s absolutely not in the budget and I will not do it right now. The windows I have are fine, my utility bills aren’t outrageous by any measure, and I can’t justify the costs for something that truly isn’t that wrong. Even as I said it, I knew getting the new windows now would be the right thing to do…it’s cheaper to get them now while we can easily change the size (considering I have a couple that are non-standard sizes)..it’s easier while the walls are open and the mess already exists..blah, blah, blah.   No, Siding Man, I will not buy new windows.

Enter, my Roommates.
Dad: “What if Mom and I bought you some new windows as a housewarming present?”
Me: “Pleasure doing business with you.”
Lesson for the day: Don’t ever walk away from a deal like that. Ever. J  

So, last night we set about taking the windows in the kitchen and the dining room out. This proved to take longer than anticipated because we didn’t have one of the tools we needed to work as quickly as we wanted. That said, we removed all four windows and built the new framing for the new kitchen windows.
It’s going to rock pretty hardcore.
Leaving my mark :)

Friday, September 9, 2011

Shingles, garage doors, and other cool stuff

Since the last installment, we’ve made some pretty noticeable progress, I’d say!
First, the roofers are nearly done! In fact, they should be finishing as I write this..
Before..

That process proved to take a bit longer than anticipated – not only were there several layers to tear off the steep roof in the front of the house, but one of the crew members had a family emergency and the entire crew was unable to work for a couple days. I can’t complain about that..because I have a soul. Luckily for us, the weather has been absolutely terrific and I’m not the slightest bit worried. My mother, on the other hand, seems to think that I will be the coziest little bat hotel in the tri-county area. I had no idea how deathly afraid of bats the women around me are until we started this project, but we’re working through it.
Working away..
Nearly done!
Snazzy recycled garage door.
With the roof nearly complete – and a snazzy new/recycled-from-the-old-garage-garage door in place – our work on the house will really fly from here. We can use the garage space to its fullest potential now – storage, workshop, shelter, etc. My dad is already planning for the workshop he’s putting together out there. The joke is that once the house is finished, I won’t actually be able to park in my own garage because he’ll have it so filled with table saws and planers that I’ll end up in the street. We all make sacrifices. J


Inside the house, we’re building walls! Not only are we stiffening and restructuring some of the existing walls, we’re also tweaking things slightly, making spaces more workable, and improving the wiring, plumbing, and insulation along the way. It shouldn’t be too long before there’s new drywall hanging back here – who knows..maybe one day I’ll get to live here?
Removing the old windows between the laundry and the garage.
...and installing a door!
First batch of carpet coming up. Stay tuned for more!

Wednesday, August 24, 2011

Playing Catch Up

Hello again!
In the time I’ve taken between updates, we’ve hit a stall in our progress. At the moment, we’re waiting on a coordinated effort among the cement contractor, the electrician, and the electric company. Getting everyone’s schedule to align (even without including my own schedule) is proving to be a slight challenge.

What we need is this: the current electrical meter is attached to the side of the house right outside my side entrance – when we built the garage addition, we thought it would be awfully nice to move the meter to the alley side of the addition and bury the line through the backyard so it’s both out of sight and out of the way. This is a matter of aesthetic preference and practicality – we need the overhead lines out of the way if we’re going to re-roof the back of the house, let alone reconfigure the pitch of the roof.
Once we have our trench dug (32” deep – which seems excessive to everyone but the City code), we can bury the connection from the existing breaker box in the basement to the new breaker box/meter in the garage. The new breaker will connect directly to the incoming power source and will run the circuits on the back half of the house. Running the circuits in the back of the house from the breaker box in the garage will save a small amount of wire/money, but will save more with regard to time and energy involved in installation.
At any point during this process, the electric company is supposed to be coming to remove the power from the house, trench through the alley and backyard and reconnect the power to the new meter box at garage’s new meter socket. (I learned that a meter socket is a fancy word for high priced metal box. It’s the housing for the dial that records how much power you’re consuming.) In speaking with the territory manager, I found that the power company we have locally will provide 25’ of trench and 25’ of cable free of charge. Anything past 25’ is charged to me as the homeowner, but the charge is pretty minimal when you consider I won’t have an overhead wire getting in the way of the goings-on at the jobsite.
Once the power shenanigans have been resolved, we can get to work on the roof.
I’m in the process of finding a new roofing contractor. The one I had contacted and verbally committed to has more or less flaked on me…which is unfortunate because I received a great bid from him. So meeting contractors starts again. It’s not my favorite part – they’re pretty quick to tell me I should’ve just built a new house. It’s unprofessional to stick out your tongue at someone, otherwise I might.
At any rate, we got a pretty good deal on the materials for the roofing project. Trusses conveniently went on sale and there was an 11% rebate on most other building materials – including sheathing, shingles, building wrap and all the other odds and ends we will need. So, in an effort to save money and a little time down the road, we bought most of what we’ll need in the near future and then some. I likened spending all that money to ripping off a Band-Aid…do it quickly and it won’t hurt as much..