Never thought I'd see the day..

We had hung siding as far as we could without making some more decisions..
First, the window needed to be re-installed.
..and trimmed
We added those pieces along the top of the bay window to make siding up to the shingles easier and cleaner looking.
Progress: Day One
Paint samples and completed siding. Dad even mulched my leaves!


I never see it from over here - it looks so small!
Sunday progress. Siding: COMPLETE!
A couple little pieces of trim left to hang around the bay window and two new porch columns to set. For now though, I think I'll catch up on some sleep :)

Tuesday, October 4, 2011

And, I'm back in the game!

Yesterday was a good day! And before noon, which never happens! J
Early in the day, I left work for a bit to meet with the City building inspector. He had to OK the new wiring in the back of the house, and it turns out we passed! Now, we can contact the power company to have them remove the temporary post on the back of the garage, hook up the permanent meter socket, and shine some lights on the house. Now that I’ll be able to stay past 7:00 when the sun starts going down I have no excuse not to be productive!
I can’t tell you, effectively, how big a step this was. Waiting for our original electrical contractor held us up for weeks. Finding another one after the original flaked took a few days, and getting everything ready for the inspection took time as well. Now that we’re over this hump, we can insulate the back half of the house (which we started last night), hang drywall, start ripping up carpet, and more! This is also really exciting because we know everything should go really fast from here. I know, you’re thinking, “Yeah, you’ve said that before,” but I’m serious now! From here forward, we won’t need to wait on contractors, inspections, or anyone but ourselves. The main objective will be making sure everything is at the house and ready when it’s needed.
In other news, I’m getting a driveway today! We had to break up a piece of the original to pour the footings and slab for the new garage. Once that was completed and we were certain we weren’t going to bury anything under the driveway, I called my cement guy and gave him the green light. Really excited to see what this looks like – we’ve been walking around gravel so long, it will be so amazing to have a nice, new, FLAT surface to walk on.

Oooh..excited! J

Wednesday, September 28, 2011

I fall down enough without help.

A few weeks ago, when we were really getting into building walls and prepping everything for electrical and plumbing work, we decided to level up the floor in my bedroom.
The floor in the bedroom itself was not out of level, but there was a pretty good drop off between the kitchen and the bedroom and the floor in the original closet sloped quite a bit.
The drop off between bedroom and kitchen. This is where I fall on my face.
As we tore out the old walls and removed the old ceiling, we found the area that was used as a closet was originally part of the laundry room, which, again, was originally a porch. In an effort to help the porch floor shed water it was sloped toward the backyard. When the porch was later enclosed and that space annexed for the master closet, the floor was left as is.
All of this wouldn’t have been a problem, had we not moved the closet.
We moved the closet for a few reasons. First, and most importantly: the door to the bedroom was small in height and width. We wouldn’t be able to do anything about the width because of the adjacent pocket door to the bathroom and a sewer vent pipe running up through the wall on the other side of the bedroom door opening.
Small bedroom door to the left. New opening is just to the right of the old opening.
Because of these challenges, we elected to move the door to the “fridge wall” in the kitchen – this will afford me a larger door while allowing the vent to remain in place, but you would then enter into what used to be the closet. So, we moved the closet over to where the bedroom door was originally and provided an additional buffer between the bathroom and the bedroom. Now, I won’t hear guests singing in the shower while I’m trying to sleep AND I’ll be able to move furniture in and out of my bedroom (without tripping!) much easier than before.
Leveling the floor:
We could only do this in good conscience because the floor was in solid shape. If there were settling or rot issues, the right thing to do would have been to remove the floor entirely and deal with those issues appropriately.
Notice how thick the strip is here..
..and here. In roughly 8', the floor dropped almost two inches in the old closet.
Using a level, find the highest and lowest points in the room. Starting from the high point, establish a level point using shims, furring strips, or two-by-fours depending on how out of level you are. As you progress across the floor toward your low point, the strips will get thicker, so take that into account when establishing your high point/first row. Secure those pieces to the floor using construction adhesive and screws to minimize future squeaking. From there, it’s as simple as ensuring that each strip is level in its own right, but also level with the surrounding strips.
I feel bad about covering these floors..

It probably sounds complicated because I’m horrible at explaining things like this without talking with my hands. I promise, it’s simple. Once you’ve got your mind wrapped around it, it goes pretty quickly.
From there, we used ¾” tongue and groove plywood to provide more rigidity to the floor while also helping bring the bedroom floor into level with the kitchen floor at the new threshold we had created. The plywood was glued and screwed into the strips – again for rigidity and to eliminate future squeaking.
Vent pipe (center) with the new doorway to the right.
Good to go!
Once this is done, lay your level down, watch the bubble, and drink a beer to celebrate your accomplishment! Once your beer is finished, you’re ready for dancing on your new floor J

Friday, July 22, 2011

Update: Floored!

Well gang, the heat subsided long enough to allow my cement contractor the ability to pour a swanky new slab for the garage floor. I can’t tell you how excited things like this make me. We talked about it last night: the work inside - while fantastic and equally as necessary - goes by a little at a time. With projects like building a garage, you can have something hugely new and different at the end of every day! It’s exhilarating….and expensive.. But mostly exhilarating!



Speaking of budgeting.. I think we’re still in good shape. The major expenses were always assumed to be rebuilding the garage and hiring somebody to roof the house. Not only am I hiring the roof done because it’s going to suuuuuuuck to tear all those shingles off, but I also really want that to be done correctly. There is a pretty steep pitch on the front half of the house and there are a lot of intricate angles to deal with there as well. Better left to the professionals!
There is a strong possibility that I may get walls on this new garage this weekend – we’ll see! J